top of page
AFTER
PROJECT DESCRIPTION
External repairs and redecorations were undertaken to all elevations of this six storey building.
Comprising concrete and brickwork repairs to the external faces of all elevations utilizing abseil and scaffold access
Decorations to all previously painted surfaces
Spraying paint finish to windows and frames of the façade.
Over coating of roof with a liquid system.
bottom of page